Why temperature rise test is conducted in bus bars and
Isolators?

Answer Posted / gajanan patil

bus bars and isolators are ratewd for contious power flow.
means they carry heavy currents which rises their temp. so
it vis necessary to test this devices for temp rise

Is This Answer Correct ?    17 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Discribe type of fault in DOL and stardelta startor.

1795


we have an energy meter in a capacitor bank panel, So should we consider it's readings as energy consumption on daily basis. (when capacitor bank doesn't have any energy losses)

1911


What are the Formula of computing Back up Time of 500kVA UPS with 4 Battery Banks, each bank composed of 43 pcs of Batteries 12V150Ah. How to compute the Back up Time of UPS? We have also 3X500kVA UPS running in Parallel same composition as I write above.

891


What are the different types of controllers?

641


why the pf of semiconductor device is improved the electrical devices

1433






What OPGW is better than Microwave or PLCC???

3642


how to define tell me about self

1509


How to calculate LT XLPE CABLE for 11 kv / 433 v , 1000 kva oil type transformer system?

1335


what is difference between 9kv 5ka surge arrester and 9kv 10ka surge arrester.

1398


Keywords: Die, Card, Coin, B/N 2 To 12

787


why and how current drawn by battery charger depends upon the altitude where it is located?

1559


what is power factor ? how we can calculate the low power factor and amount of capacitor for improve that low factor ?

1079


how we explain parallel paths armature winding?

1448


In Dyn11 power transformer if any one of the 3 phases connected to earth in star connected side then please explain effect of the current flow in delta connected side of transformer.(In this case if one phase is shorted to ground in star connected side then we observe the current flow in two phases only not three phases in delta connected primary side. Please explain why it is so?)

1292


what purose of the double circuit transmission line phase of the line phase changed for circuit-1 for Circuit-2 R-Y-B B-Y-R

1814