What is meant by single cycle plan ?how it works?
Answer Posted / sagar
Single cycle plan is Time base or Performance base
plan,here no maintenace stratergy assign. It will works on
fix monthly,quaterly,yearly,hourly or revolution base cycle
plan.
During creating single cycle Time base plan T-code IP41
enter maint. category PM Maintenace Order,enter perticular
equipment for creating prev.maint& assign task list & enter
the call horizon , sceduling period in plan.Then scedule it
T- code IP10,Then check it prev.maint.order created in
sceduling overview list T- codes IP24. Then select order go
to change order T - code IW32, If component req goods
movement , Confirm PM order IW41, Change order IW32 for
techo,settle order KO88 , then change order IW32 check the
settlement in cost,buiseness complete.
During creating single cycle performance base plan create
measuring pointor counter T- code Ik01 , then T-code IP41
enter maint. category PM Maintenace Order,enter perticular
equipment for creating prev.maint& counter & assign task
list & enter the call horizon , sceduling period in
plan.Then scedule plan T - code IP10,Create document for
entering reading. Then check sceduling overview list
IP24,chnge order IW32 , good movement, confirm order IW41,
Settle order KO88. Change order IW32 check settelement
complet bussiness.
| Is This Answer Correct ? | 8 Yes | 2 No |
Post New Answer View All Answers
A reservation is triggered from a maintenance order and user is trying to issue material from warehouse with reference to the reservation. But system is not allowing goods issue? What I need to check?
Which configuration setting allow a calibration order to trigger an inspection lot from maintenance order?
What is business purpose of equipment bom?
What is the flow path of maintenance order?
What is purpose of serial numbers in sap pm module?
What are activities of a sap pm?
Suppose there is a difference between the planned and actual hours of internal manpower where will you document the reason/ cause of this variance. Is there any standard sap facility available to address such situation.
Which table would you use to extract the equipment hierarchy installed under functional location?
How is corrective maintenance different from breakdown maintenance?
When to represent an object as equipment or as functional location?
Do we need to run this transaction code ip30 for all the maintenance plans which are scheduled on regularly daily basis or weekly basis so that if any scheduled object exists then it will get converted into the service order ?
Is it possible to determine header tasks automatically at save without selecting the save + determine tasks button?
What is concept of equipment numbering?
How pm module is integrated with ps module?
What is call horizon? Explain with example.