which power plant has high load factor?
Answer Posted / ritesh
the ans can different that given here because the total
power factor is depend upon your generating power plant
that how much it generated and how much power required to
your area.
| Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
i am venkat i got gre 930(verbal 270 quanta 660) and my toefl score 105..here question is why u got less score in gre ? what i supposed to tell...any chance of rejection is there...my accadamics record is very good
with help of neat sketch explain principle of TIG welding process
for what purpose the star point is done in ct
if the armature current in a dc generator is ac ( sinusoidal ) why doesnt the sjhape af armature mmf a sinusoidal (ni) ? armature mmf in case of a dc machine is triangular.
please give me all the Alarm .Trip ,Safety Relays & Conditions of UPS Systems mail me on ashokbabunhce@gmail.com
i m electrical diploma holder i want to do plc $ Scada some body tell me which insitute is best for me near chandigarh
what is mathed of check the D.C MOTOR 181 KW (ARMATURE AND FIELD) WHAT IS THE MATHED OF CHECK THE THYRISTOR MODULE (HIGH CURRENT)
what is the soft starter principle? how is connection diagram? what is the procedure for checking the connection?
can we install HT panel & LT panel side by side or how much clearance is required ?
i need project topics along with circuit diagram in the electrical and electronics engg and also some websites regarding projets.
Dear sirs, pls check this 4-20ma to RS485 module datasheet,pls guve me some suggestions. http://www.szsunyuan.com/sy/pro_more.asp?Productid=539 Thanks. E-mail:yunianjiang99@gmail.com
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.
Give the expression for the frequency of oscillations in an op-amp sine wave oscillator?
why r we using shell transformer for low voltage
What will happen if the armature resistance is in minimum position and the field resistance is in maximum position while starting the motor