What are the commercial names of overhead conductors used
in India?
Answer Posted / navdeep
moose
panther
bermisis
dog
zebra
squirrel..etc
| Is This Answer Correct ? | 6 Yes | 5 No |
Post New Answer View All Answers
how does the rotating m.m.f is produced in the 3-phase induction motor and how the poles are created in 3-phase induction motor ?
use of PIR in ehv breaker
Which thing is maximum in RLC circuit at resonance a)power consumption b)inductive current c)capacitive voltage
why most of junction box vendors providing T5/T6 Temp class jb's for T3 area any special reason?
what is the formula for computing cable tray size & capacity
what is cogging and crawling
Why frame of the motor is specified?. If we mention KW and voltage level,automatically frame is decided or separately frame is compulsory to mention?.
What will be electrical cost per sqft for IT building (basebuild and fitout)and for residential township?
how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating)?
Where servomechanism is used?
A 15 kw squirrel cage motor having a maximum efficiency of 90% on a continuous full load has temperature rise of 42 degrees celcius after 30 min and 52 degrees celcius after 1 hr under the above operation conditions. a) calculate its final steady state temperature rise on continuous load and the heating time constatnt. b) if the motor is operated on a short load for 9 min estimate its temperature rise. c) calculate the maximum overload that can be applied on a short, 9 min rating so that the temperature rise is the same as the final steady state temperature rise on continuous load.
Explain what is use of lockout relay in ht voltage?
In HI POT test what is reason for applying the AC VOLTS and DC VOLTS in different applications what is the nessesity for this ?
Dear sir, How to calculate 3.5 core pvc aluminium armoured cable meter wise carrying amps rating.Please give the solution with a good example.
A generating system will have a total capacity of 300 MW. Find the probable forced outage when the capacity is supplied by two 150 MW units. The operating probability of all units is P=0.98 and forced outage probability rate Q =0.02 .