i have a bar of 36 dia in column, what is the lap length?
Answer Posted / kamesh
50x dia of rod
so 50x36=1800mm
| Is This Answer Correct ? | 10 Yes | 6 No |
Post New Answer View All Answers
what is labour consume factor in residential projects
What are the skills required to become an architect?
How high should the water tank be to provide a 60 psi at base of this water tower?
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?
What is reinforced concrete?
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
what is grade intersection?
how to remove the quantity of metal 1 and metal 2 in concrete
What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet
how to calculate the scour depth
i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)
What materials were used to build the golden gate bridge?
What is the method of soil replacement test?
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.