Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how preparing for barbending schedule ? how to preparig for
two leged stirrups?

Answer Posted / arif qureshi

first take clear span dimension.
bottom bar length = clear span+Ld of the bottom bar+2d.

where Ld=development length of the bar
2d = 2 X dia of bottom bar (extra length added for
elongation of bar due to bending).
Same formula is used for the top bar length.

Curtail bar length = Clear span -0.2(clear span)
Stirrups length = (((B+D)-4Cover)+ 10d)*2
Where B = width of beam
D = Depth of Beam
d = dia of bar used for stirrups.

Weigth per Meter length =d*d/162
Where d= dia of bar

Is This Answer Correct ?    51 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to calculate valuation for the old building?

2474


how much percent are used 20mm,10mm?

2021


Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method

1813


the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none

2232


How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?

2005


What is the biggest dam in america?

1229


List out some of the common problems that architect have to tackle it?

1131


02. a. The diagonal of a 9 cube…………… 1 b. Surface area of 9 cube…………… 1 c. Volume of 1-3 cube …………… 1 d. Compressive area of 6 cube …………… 1 e. Top & Bottom face of a Cylinder/Cube is to be proper leveled to deliver the…………………………..…… properly.

2219


how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you

2661


what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon

2852


Define Who designed the city of Washington DC?

1157


In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.

3380


What are the benefits of rcc pipes over steel designed pipes?

1515


can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now

2214


1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM

3234