how preparing for barbending schedule ? how to preparig for
two leged stirrups?

Answer Posted / arif qureshi

first take clear span dimension.
bottom bar length = clear span+Ld of the bottom bar+2d.

where Ld=development length of the bar
2d = 2 X dia of bottom bar (extra length added for
elongation of bar due to bending).
Same formula is used for the top bar length.

Curtail bar length = Clear span -0.2(clear span)
Stirrups length = (((B+D)-4Cover)+ 10d)*2
Where B = width of beam
D = Depth of Beam
d = dia of bar used for stirrups.

Weigth per Meter length =d*d/162
Where d= dia of bar

Is This Answer Correct ?    51 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32

1885


Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.

1324


(Project Management Topic) What are the important criteria in the successful realization of the project?

1654


significance of specific surface area of particles?

1778


Define What is made from large rocks, which protects the base of cliffs?

651






what is the procedure of wet seiving. n percentage of silt in different type of soil?

2167


How do you prepare Material Recovery Statement for deduction from contractors bills?

1095


What are the responsibilities of a site manager?

616


how can calculate the compressive strength of concrete cylinder by water cement ratio ?

1227


How to determine dia of steel for use in column,slab etc. i mean how to calculate the diameter of steel which is to be used in structures.

1795


What are the composition of a landfill?

662


What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?

1666


Scaffolding IS code NO.

1771


Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3

1494


how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.

2135