How to check percentage of bulkage of sand in RCC?

Answer Posted / mahendra mohan srivastava

first we can weight sample of sand then we can take it to
SSd condition then we calculate moisture and if moisture is
6 % then bulkage will 30 % so we can put 6% less water and
30% execss sand after correction.if moisture will exess to
6 % then we will take less water equal to moisture and sand
will not exceed.

Is This Answer Correct ?    29 Yes 18 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How many mortar required for Brickwork of 1 Cu.m works??

1054


How is calculate the cube molt

1786


What is horizon or horizontal mining?

637


Give me an example of a time when something you tried to accomplish and failed.

2488


very simple or less time consuming formula for reinforcement calculation by moment

1044






What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?

2157


what pressure the NP2 class RCC pipe can sustain?

2210


What is geopolymer based concrete?

2145


What do you meant by gui?

721


SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?

2243


How to calculate brick work quantity?? Block work quantity??

2111


What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m

1746


what is grade intersection?

1600


Why Vitrified tile are getting pop up.

528


How much cement,sand,bricks and water needed for 1square metre brick work?

1333