How to check percentage of bulkage of sand in RCC?
Answer Posted / mahendra mohan srivastava
first we can weight sample of sand then we can take it to
SSd condition then we calculate moisture and if moisture is
6 % then bulkage will 30 % so we can put 6% less water and
30% execss sand after correction.if moisture will exess to
6 % then we will take less water equal to moisture and sand
will not exceed.
Is This Answer Correct ? | 29 Yes | 18 No |
Post New Answer View All Answers
How many mortar required for Brickwork of 1 Cu.m works??
How is calculate the cube molt
What is horizon or horizontal mining?
Give me an example of a time when something you tried to accomplish and failed.
very simple or less time consuming formula for reinforcement calculation by moment
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
what pressure the NP2 class RCC pipe can sustain?
What is geopolymer based concrete?
What do you meant by gui?
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
How to calculate brick work quantity?? Block work quantity??
What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m
what is grade intersection?
Why Vitrified tile are getting pop up.
How much cement,sand,bricks and water needed for 1square metre brick work?