11kv/0.433kv, 2 mva , transformer , for protection and
metering how many CT/PT are required?

Answer Posted / a.k.mishra

3 ct having 3 core for metering & protection
3 pt for mounted R,Y,B induvisualy for metering & protection
also 1 neotral ct is requried for star connection

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the Resposiblity of Electrical Utility Engineer

2405


In power transmission using open belts or horizontal shafts it is preferable to have the slack side of the belt on the top because

760


What should be the height of basement according to NBCC code?

1706


I am using submission of two ct in one and half scheme for 67/67N protection. Both CTs star point is grounded separately near ct box.Will two point ground give wrong tripping to 67/67N during fault or no matter.

1637


What is the power factor of a transformer at no load?

650






Which types of gate insttaled in static switch. Please give me answer.

1165


why the protection turbo generators is most complex?

1501


how to select rating of HT Panel

916


What is servo lock in CNC how they work and if any parameter for them in CNC machine

4780


What kind of Neutral CT can be placed in 11/0.433KV transformer to be used and what are its specification?

1396


how hydrogen cooled alternator undergo maintanence ? that is hydrogen when come in contact with air can result into explosions .

1507


what is the grounding Calculation formula? spouse i want to provide grounding to 3phase 18kw motor or i want to provide ground to 3phase 10kva dry type transformere or you give me any exemple...... Thanks.

1443


Dear sir, I have completed DECE in the year 1995. I have work experience in HT and LT LINE more than five years. Now i am doing BE in EEE from rajasthan university. After completion of BE,can i apply "C" Licence sir? Please reply.

1480


how i can calculate the size for fire cable

1484


Whether should be the oil level in OCTC transfomer? It should be upto winding immersed completely or should be upto tap changer s/w? How it will affect the performance of the transformer. Rating may be 33KVA

1395