1) what is the use of pin and plate vibrators during slab
casting? 2) how much cement bags are required for 1sqm
4inch brick wall? 3) Is it viable to provide overlap at
column , beam & slab junction. if no why? 4) if bar dia is
changing in column reinforcement , which dia bars overlap
is considered? 5) what is isolated and ecentric footing?
Answer Posted / modipraveen
Hi, I am answering a answer for each question.
Pin/ Needle vibrator are to remove air/void in concrete
generally its used for deep thing like Beam, columns and flat
slab and even slab where heavy reinforcement is used.
Plate vibrator are used to have rigid base like grade slab,
RCC/CC roads.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
Define What are the materials used in building a gravity dam?
As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
What is binding spacing of the rebars at lapping zones.
Pls explain me about tension and compression in a flat slab
how can i calculate cement in brickwork
what is the dimensions of river sand truck trailer or trolly ?
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
what is called the inverd level of mabhole chamber?
What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
Explain soil analysis?
150mm bricks size how many use 4.14 m3