Answer Posted / modipraveen
M10, M15, M20, M25, M30, M35, M40, M45, M50, M55, M60, M65
etc., its depend on load, span, depth of member
| Is This Answer Correct ? | 24 Yes | 7 No |
Post New Answer View All Answers
how do you calaculate the total steel quantity of an rcc building using thumb rule?
Explain the importance of moment of inertia?
As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.
how to check and keep control on the wastage of material at site
How can we make a hole in a solid rectangle using solidsworks?
what is called Bulk Density of aggregate?
for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete
What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil
How will you Engage Labours on Site?
What is packing Factor ?
How and where are aqueducts built?
if we use 1.25 bag of cement 3 pharma metal and 2 pharma crush sand what is the strenghtexpected for RCC column
Define What does civil status mean?
how many digree of freedom in four bar chain
What is Architect-Prepared Contract?