how to run the qtp scripts in Test director.is it posssiblr
or not??
and also i want to see the previes test results,how to see
and where to see??
Answer Posted / ravichandh
Test Director will not support QTP. Only Quality Center 8.2
and above versions will support QTP.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Disavantages of document generator? How to take a print out of the steps in the Parameterized scripts?
What is the main purpose of storing requirements in test director?
What is the purpose of (three)each view?
How to customize the reports generated?
What is the use of test lab in test director?
how do you integrate Perl or shell automation scripts in TD?
How can we add requirements to test cases in test director?
What is quality center( test director)?
What r the mandatory fields in TD?
Explain the procedure of connecting testdirector in qtp?
Hi All, Im currently getting to grips with the Document Generator in Test Director and have a query. We use TD to link requirements to test cases and I am attempting to produce a report which lists the requirement and the test case it is linked to. I cant see a way to do this as the test case link info resides on the Coverage page and it appears the only field available to display for requirements reports within document generator as those on the 'details' tab. Any tips?
what are the type of testing and methodologies
How to identify test cases with no scheduled test runs.
Of course, Test Director has recapped as Quality Center. What is the main difference between 8.2 version and 9.2 version of Quality Center?
How do I run reports from test director?