If there is no sufficent time for testing & u have to
complete the testing then what will u do?
Answer Posted / madhukar9823
If we doesn't have enough time for testing then it is
completely based on risk management factor, we have to
select the module which is having more priority, by based on
the priority for the module we have to finish our testing
process
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is your Approach when you find 10 Sev-1 bugs in 50 test cases?
Define cause effect graphing?
What is the difference between functional requirement and non-functional requirement?
Explain unit testing, integration tests, system testing and acceptance testing?
Scenario-based testing Option 1 concentrates on actor and software interaction Option 2 misses errors in specifications Option 3 misses errors in subsystem interactions Option 4 Both 1 abd 2
What is a code walk through?
Am putting E-commerce project in my resume can any one please tell me about E-commerce application explaination..
In what situation would you want to parameterize a text verification check?
A defect which could have been removed during the initial stage is removed in a later stage. How does this affect cost?
what types of testing have u done in ur project?and expalin it detail?
Can you explain calibration?
How to test a Falsh player scrollings?
How soon the bug should get fixed?
functional testing test cases for transfer funds ?
what technical problem u face in your module please tell what is it mean its any bug or anything else i want ans give any example which ever modul u r working for u can give me any example