If there is no sufficent time for testing & u have to
complete the testing then what will u do?
Answer Posted / madhukar9823
If we doesn't have enough time for testing then it is
completely based on risk management factor, we have to
select the module which is having more priority, by based on
the priority for the module we have to finish our testing
process
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is mean by Schedule report who is the responsible for generated that one ?
Is Anyone attended the manual testing interview with capgemini in recent past. please let me know the type of questions they can ask. Thanks
Do we have any certifications for ETL Testing ?
What type of metrics would you use?
Which test cases are written first: white boxes or black boxes?
1)What are the QA procedures followed 2) Write test cases on a weatherreport.com web page that has only two dropdown and a submit button, Fist drop down is a countries and second is metros in the selcted countries.When proper selection si doen and submitted it shows weather report of that metro.? 3)Write test cases on Mobile Alarm Module? 4)Write test cases on Company Water Bottle?
Explain the difference between alpha testing and beta testing.
What type bugs you will find in integration testing with example?
How many bugs occured will be considerd appropriate over 1000 steps when inspecting software? Describle an approriate Bug value.
How can we test for drastic (severe) memory leakages?
Write a Test scenario for Outlook Search functionality.
What's the difference between system testing and acceptance testing?
Tell me some Adhoc testing scenarios of ebay (online auction product)?
Please is there any one working with ITR.COM? Having interview with them. Any tips will help.
I have 6 months experience as project tarine and one and a half year experience as software engineer.Should i write taht my total experience id 2 years.