i heard that power factor(PF) is the main concern for
industries, if they are maintaining PF around 0.6 they will
be fined for that. now the question is, how can they improve
the PF ranging between 0.9 to 0.95 which is safe for them
i,e escaping from the fine?
Answer Posted / edy
Let say the load 500kw and u wanna increase ur power factor
from 0.6 to 0.95
500 (Tan 1-Tan 2)-u can use complex calculator to convert
from cos to tan
500 (1.33-0.32)
505kvar
u can set it with 6 step
505/6
84kvar and make it 80kvar each step
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is the function of capacitor duty contactor in an capacitor panel???
How harmonic block test are conducted on relays ( Siemens,Areva ect )power transformer using omicron kit?
What is meant by derating factor?
How Calculet The UPS AH In Load
How does cost of generation from hydropower plant compare with other sources of electricity?
1.what is difference between ATS & STS main use. 2.what is difference between ACB& VCB With symobles,and main partes, manimum range. 3.How many types of relays and main function.
how to determine Sq.mm size of finolex power cables.
if an insulated power and control cables of a running gas diesel gensets laid direct in an open trench i.e, trench bed is not rcc of a power house in which rain water, spillage water alwas exists and all power control cables remains submerged even when gas gensets of 480 kw each runningin on load. These power &control cables runs from power house to switchgear room through these trenches in which water remains most of the time. pl explain its merit & de-merit
how to generator maintenance (A Check, B check,Etc)
why constant voltage transformer should be start without load? and if started then what will happen?
Is it possible to measure correct value of earth resistance & cable insulation ristance with out disconncting earth lead & both sides of cable ends? If not, any other method to measure ER & CIR with out disconneting from the system.
I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?
What are your future plans for the company if permanently employed?
how to decide no of electrodes for 1600A LT Main incomer panel
what is the soft starter principle? how is connection diagram? what is the procedure for checking the connection?