Answer Posted / devendra23
as per RCC consultant
| Is This Answer Correct ? | 2 Yes | 13 No |
Post New Answer View All Answers
How much 1 cum of M15, M20 & M25 concrete weigh?
How to increase a bearing capacity of soil?
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
What is chemical composion test
how much area can be platered by a mason for exterior
1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...
Draw the cross section of a boundary wall and label its part with detailing?
what is the water-cement ratio of mix design while 30mpa in 7 days?
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
How you read 5x3x1 #4 @ 20" 0/C in steel structure?
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
How does siphoning work?
How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM