Answer Posted / abo-obaid
Many of the testers think that the time to exit is to
finish your homework (execute all your test cases)
this exit criteria is very weak because it has nothing to
do with the SW quality.
A good way is to have an estimation based on # of defects.
but you have to be carefulle here, becase underestimation
will lead to "Never finish", and the overestimation will
lead to "Finish early"
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
What is an mr?
Discuss what test metrics you feel are important to publish an organization?
What does entry and exit criteria mean in a project?
how to access a build & wat is its configuration
.In languages testing, what is the fixed part and changing part?
Risk Analysis a) 2 step, b)3 step, c) 4 step, d) 6 step
hi, this is geetha, i have one doubt regarding the vulnerability testing. For sql injection testing is there any need for the tools to be installed. If it is what is tool and what is the method to test in sql injection testing. Plz Guide me
What is bug release?
How a test engineer will convince a test lead when he didn't approve the bug as a report ???
how agile testing is performed and what are the related documents.
what is acid testing?
What is test management?
how to test a store procedure?
I know functional test cases are derived from frs and system design specs. But are test cases for performance, database, boundary, relational integrity and other types of tests other than functional tests created from frs and system design specs as well? When are these test cases created? Are they in the same test plans alongside functional test cases or is their a different test plan that includes these test cases?
Explain what is exhaustive testing?