Answer Posted / laxman kamulugari
Planing the material for procurement based on the your
requirement.
1. MRp - Material requirement planing
This based on the work order planing system generate the
Indents( like sales order and demand order)
2. CBP-Consumption based planing
This based on the settings of reo-ordr point & stock levels
& lot size settings (MRP views) system generate the indents
based on this settings in M.m
Regards
Laxman
| Is This Answer Correct ? | 10 Yes | 2 No |
Post New Answer View All Answers
Mention what are the data contained in the information record?
How to create movement type?
What is purpose of safety stock in mrp view in material master?
I have created a new vendor. Later I found that there were some mistakes and that I want that the system should not allow me to make any po or post any entries to this vendor. How to deactivate this vendor?
What is an rfq and how is it different from the quotation form?
What is the difference between release procedure with classification and without classification and when they used?
How do we create a client in the mm module?
what are the major purchasing tables? List the transaction codes for them?
What are various procedures for counting physical inventory?
Differentiate between bsx and bsa
What are the main master files used in mm?
What is the class type?
What is the last step in the procurement cycle?
What are the levels at which a batch number can be configured?
What is the importance of client in sap?