during site visit if i find voilation going on,what can i
do,how i act?
Answer Posted / binu
stop the work and record the same in any relevant documents applicable.
| Is This Answer Correct ? | 9 Yes | 0 No |
Post New Answer View All Answers
How many mortar required for Brickwork of 1 Cu.m works??
what motivates you to do a good job
HOw much % of premium on DSR-2013 currently
how we can find sieve #4 is 4.75mm?
which steel is better for residential building tmt steel or hysd steel
What is the procedure of concealed plumbing in toilets?
how to clculate the %of concrete strenght achive after curing?load
Why M15 is replaced by M20 when ammendment are made in IS456 in 2000?
How to calculate carrying capacity of the existing water supply trunkmain
Explain what is the difference between built area and super built up area?
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
How to marking the building
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
how to convert sand in Cft to Kgs
01. a. Diagram of a slump cone…………… 1 b. Size of Slump Cone…………… 1 c. Volume of a slump cone by av. Dia method…………… 1 d. Volume of a slump cone by av. area method…………… 1 e. Volume of a slump cone by frustrum method …………… 1 f. Angles of slump cone …………… 1 g. Slump measured by slump cone due to…………… 1 h. Slump does not measured by cylinder / cube due to …………… 1 i) ii) i. Slump cone is to be filled in……………………..Layers.