during site visit if i find voilation going on,what can i
do,how i act?
Answer Posted / binu
stop the work and record the same in any relevant documents applicable.
Is This Answer Correct ? | 9 Yes | 0 No |
Post New Answer View All Answers
Explain the different types of building contracts?
how much repeitation for conventional and maivan formwork?
IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI
how many types of survey and what are levelling instrument?
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
Which are the Steel tests ?
if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?
Why should you consider yourself fit to be hired by jindal steel.
What is critical path method (c.p.m)?
Explain what is zoning permit?
What are some facts about concrete?
Explain the design for rcc multi-storied building?
sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.
how to calculate valuation for the old building?
What does a construction cost covers and what does not?