Can we connect two or more energy meters/Amp meters on one
CT set(Three phase).
Answer Posted / shariff
More 2 Ammeter/Energy meter can be connected on CT secondary,
provided their burden (VA) rating should be high, otherwise
its accuracy will fall.
| Is This Answer Correct ? | 22 Yes | 2 No |
Post New Answer View All Answers
Why do we pefer VCB over OCB?What are the advantages of VCB over OCB?
An ELHNC 80amp 240v 30mA RCD is tripping periodically, every 30 - 180 seconds is it safe to disconnect the protection circuit?
How to address the servo drive for motor
What are the special cables required for explosion proof wiring?
If Neutral Grounding Resistor (GR) failed/shorted. Is it repairable.
what is sevice settings for mccb?How can be it setted?
Do any one know exacatly when the results for NHPC held on 8th march 09 for engineering trainees will be released ?. if so please post it, i'm eager to know it.
I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?
what are the necessary basic electrical topics to learn for mechanical engineer to deal practical problems.
HOW MANY TYPES OF FUSE?
1.what is mean by 8/20 micro sec waveshape
for hipot test on 33kV busbar, we will test on 70 kV or 56kV, what is the acceptable leackage current?
Why is water motor not taking the pressure? what is the problem?
how did the testing of protection relays done through current injection
If short circuit ratio is high is it bad or good for a machine then tell the reason...