in pile foundation pile socketing length depend on which
factores?
Answer Posted / prasadarao
generally socketing is boring further after the strata ia
hard rock generally socketing is done twice the diameter of pile
Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
what course did you consider thinking before you enrolled in college?
How did the romans get water up hills using aqua ducts?
how statics is different from dynamics
Define graphics window?
Why does the pressure increase under soil?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
How much sand and cement requirement for 1 SQM 125mm thickness Brickwork
material used for mendrel use to bend epoxy coated rebar
225 mm thick RCC slab, how many ton load slab can carry? for example if 33 ton truck loaded with soil, truck having 6 wheels. slab can take load or not? grade of concrete is M35 and slab design Fe500, slab desing one way slab.
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.
What is Gsb tollens ?
In cement concrete how to check a quality of material also proportion of material at site ?
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
what is the use of water bar in water tank and is this an extra item in estimate?
what is grade intersection?