Answer Posted / lokesh
first we need to converted flat files in tables ofter join
the oracle and that table
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
Source has 2 columns: USA,NewYork INDIA,MUMBAI INDIA,DELHI UDS,CHICAGO INDIA,PUNE i want data in target like below: INDIA,MUMBAI1 INDIA,DELHI2 INDIA,PUNE3 USA,NEWYORK1 USA,CHICAGO2
What are orabulk and bcp stages?
What are the various kinds of containers available in datastage?
Is possible to create skid in dim,fact tables?
What are some prerequisites for datastage?
if we using two sources having same meta data and how to check the data in two sources is same or not? and if the data is not same i want to abort the job ?how we can do this?
Explain entity, attribute and relationship in datastage?
im new to this tool im now at project plz tell me step by step process how to design plz help me i wnt to go with exp for job plz give me d proper design and explination
options available in sequence job to run,validate?
create a job that splits the data in the Jobs.txt file into
four output files. You will direct the data to the
different output files using constraints. • Job name:
JobLevels
• Source file: Jobs.txt
• Target file 1: LowLevelJobs.txt
− min_lvl between 0 and 25 inclusive.
− Same column types and headings as Jobs.txt.
− Include column names in the first line of the output file.
− Job description column should be preceded by the
string “Job
Title:” and embedded within square brackets. For example, if
the job description is “Designer”, the derived value
is: “Job
Title: [Designer]”.
• Target file 2: MidLevelJobs.txt
− min_lvl between 26 and 100 inclusive.
− Same format and derivations as Target file 1.
• Target file 3: HighLevelJobs.txt
− min_lvl between 101 and 500 inclusive.
− Same format and derivations as Target file 1.
• Rejects file: JobRejects.txt
− min_lvl is out of range, i.e., below 0 or above 500.
− This file has only two columns: job_id and reject_desc.
− reject_desc is a variable-length text field, maximum
length
100. It should contain a string of the form: “Level out of
range:
8000 jobs r there i given commit, suddenly job will abort? what happens? 2)diff b/t transformer stage & filter stage? 3)how to load the data in the source?
If you want to use a same piece of code in different jobs, how will you achieve this?
What are sequencers?
what are the errors,warnings in datastage
AGGREGATOR default datatype