what is LA CT PT panel?
Answer Posted / jariwala vishnu m.
LA - lightnig arrester
CT - Current transformer
PT - potential transformer
the panel from which all the above stated equipment are
controlled is LA CT PT panel.
with the help of this panel we can get data as well as
control the substation's equipment.
| Is This Answer Correct ? | 22 Yes | 6 No |
Post New Answer View All Answers
What are the advantage of free wheeling diode in a full wave rectifier?
A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.
types of central Air conditioner plant?
What is mean by STUB protection?
How to calculate phase to phase difference ?
hii this is ranjith from hyd... i want to know what type of questions they ask in interview...and hw the interview will go..? what subjects thay ask specially for electrical engg students?
Given a collection of points P in the plane, a 1-set is a point in P that can be separated from the rest by a line; i.e. the point lies on one side of the line while the others lie on the other side. The number of 1-sets of P is denoted by n1(P). The maximum value of n1(P) over all configurations P of 19 points in the plane is 18
Dears we deal in Chemical are Plate earthing. Kindly call if any requirement and questions. Tech Earth Solutions Mohit Verma 8791071007
what is mean by drives?
Hi I'm doing my MBA(3rd semester).I applied for the post of ET conducted by BHEL the last year.I cleared the written and lost in personal interview.Again I wrote the exam this time and cleared the written n yet to take the personal interview.Shall I disclose in the interview about my studies.What shall i say if they ask about my change from studies to job
Draw a SLD for main panel for school having connected load of 1200kw and emergency generator 200kw.also show the increase of additional load of chiller 225kw in the lv panel indicating meter postion size of transformer ,cables and capacitor bank.
we are small scale industry in production of rice & rice bran. Pls let me know how to take contract demand for our industry.. (for information we have total 600.hp)
I want to know Electrical Circuit?
Inductor and capacitor........power in one phase and ...... in it another phase.
How eddy current generation support the idea of train braking?