at source level i have 40 columns,i want only 20 cols at
target what r the various ways to get it

Answer Posted / balaji

Using transformation stage
How t o use:
Double click transformation stage

Select 20 columns

Drag and drop there target links.

Click on Ok

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is size of a transaction and an array means in a datastage?

726


Have you used Unstructured data?

824


How to implement complex jobs in data stage?

604


Different ways a project can be moved to production ?...example ….export-import and Version control.

1925


What is orabulk stage?

619






Is the value of staging variable stored temporarily or permanently?

565


8000 jobs r there i given commit, suddenly job will abort? what happens? 2)diff b/t transformer stage & filter stage? 3)how to load the data in the source?

1776


What are the types of containers in datastage?

696


how to achieve this output ? Two Input columns(ID & Name) - ID | Name 1 | Jack 1 | Kara In output there should be only 1 column which will be populated as - 1,Jack 1,Kara

353


How a server job can be converted to a parallel job?

613


what is the use of materialized view?

952


How do you register plug-ins?

593


What are the features of datastage flow designer?

621


how can we create rank using datastage?what is the meaning of rank?

8154


i WANTED TO USE THE RANGE LOOKUP SCENARIO IN DATASTAGE 7.5.2 SRVER JOB.i HAVE A DATE FIELD IN SOURCE AND I SHOULD MATCH IT WITH A FIELD IN LOOKUP FILE.BUT,THE FIELDS SHOULD MATCH EVEN THOUGH THERE IS SOME RANGE.CAN SOMEONE TELL ME HOW CAN I DO THAT. THANKS

3309