I'm puting roof slab M20 Design Concrete,Twoway slab how
many days wait for remooving of shuttering?
Answer Posted / baskar
7 days
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete
what is the calculation of raw material for 0.35cum of m-15
What is the snap size in civil and how can we create it?
what is constat for brickwork
How to calculate construction cost of residential building in mumbai
which has high compressive strength between hollow block and brick masonry?
how much shouid be the rate for ready mix concrete per cubic meter
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
what is the function of GSB all class ?
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
what is the permanent solution applied for restoration of leaning tower of pisa?
quantity of material needed for rubble stone masonry for 1:4 and 1:6
Define What is a kip?