Answer Posted / vicky
Developement length is the length of the bar reqd to
transfer the force in the bar to the surrounding concrete
through bond.this length of embedment of bar beyond the
theoretical termination point is required so that the bar
doesnt get pulled out.
Ld = 0.87fy X dia of bar / 4 X design bond stress
| Is This Answer Correct ? | 20 Yes | 4 No |
Post New Answer View All Answers
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
RR masonry rate analysis
How many Sft of Level Plaster per Kg
How to calculate brick work quantity?? Block work quantity??
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
strength of bitumen concrete with 80-100 & 60-70 grade bitumen
What is Curtailing of R/F
What is the difference between shear and tensile strength?
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)
How to calculate the crank rod in slab
what is thumb rule for calculating the size of ISMB required for a particular length of span
will fix foundation bolts at site with out template is there any procedure?
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...
How to calculate material and labor required for 100 m2 plaster?