Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is basic working principle of Governer in power plant?

Answer Posted / vaibhav v t

Auto regulation of steam pressure/flow with respect to
speed of the turbine.

Is This Answer Correct ?    18 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are different type of instrument cable

2256


please send the sample qustion paper for iocl written test ..

3694


How to change dcs card in online. (Dsc is maxdna)

2709


What is Predictive Maintenance

1154


hey any one got the papers of SAIL and HPCL plz do help me by posting them to my mail ID's naren07_87@yaho.co.in, surenarendra@gmail.com

1912


Explain the working of an electronic level troll.

1065


How to decrease opening & closing time of on/off valve?

1481


Why do we floating DC in DC system.

2885


Programmable Logic control.

1940


Question on maha cement

725


i want formula for flow control.am doing project in flow control using orifice . i know value of the flow level(Q) . upstream(p1) pressure, orifice diameter(Do) , pipe diameter(Di) and oil viscosity(Vi) how can i calculate downstream pressure

1895


what is the electrical operation procedure for switching on 27.6MVA electric furnace.

2019


Do you have reference list?

1822


Explain an adaptive / self-tuning controller’s major draw card.

2309


A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.

2159