why the generator will take 8 to 12 hours to start after it
got interrupted due to technical problems in case of power
plants.
Answer Posted / venkatesan.j
In a thermal power plant the prime mover is a steam
turbine. In order to obtain the rated speed in a turbine it
takes about 4 to 6 ours depending upon the type and
capacity of the turbine.
| Is This Answer Correct ? | 3 Yes | 4 No |
Post New Answer View All Answers
if i get a drop in my 1st year and the i clear my 2nd year and 3rd year all clear and i dont have any back logs so can i be able to sit in campus selection??
what things to be considered when designing UPS
What are the special cables required for explosion proof wiring?
What are conduct on the testing in cf in ur site?
nwhat are the main Components of servo motor?
What are the parts in a inverter?
Dear all, I want to use Induction motor to open and close a 1 ton door. How much power do I need. Thanks
comparision between ACB and VCB
What is meant by reactance voltage?
What is the two pole structure?
I am experienced with house and industrial wiring but I don't have any licence how can I apply an licence and which type of licence i can get i didn't complete deee just only experience
What are the advantages and disadvantages of short-pitched winding?
How Can I calculate for the photometrics requirements for a street lighting? Data given are: 45 units of 6 meter light pole with 150 watts metal halide lamp, 220 volts and installed in a promenade area.
how the aircraft outer body and inner body is separated ?
how a flip flop can be used as a latch?