why the generator will take 8 to 12 hours to start after it
got interrupted due to technical problems in case of power
plants.
Answer Posted / venkatesan.j
In a thermal power plant the prime mover is a steam
turbine. In order to obtain the rated speed in a turbine it
takes about 4 to 6 ours depending upon the type and
capacity of the turbine.
Is This Answer Correct ? | 3 Yes | 4 No |
Post New Answer View All Answers
What are the significant parts of dc generator?
Explain the laying procedure and laying depth of submarine/subsea power cable for 220/400KV system? Also available cable diameter?
How does an induction motor start?
What are the basic & Majour problems in UPS ?
Is there any Electrical supervisor license which gives permit to work whole India rather than individual state??
What does the kvar means?
i have flexible wire. size of conductors is 0.190 mm & no.of conductors are 48. then size of wire comes 1.37 sqmm instead of 1.5 sqmm . the what is tolerance for this size.
How many energy meters can be connected on a 15VA Voltage transformer. please send a calculation sheet.
what is thermal resistance of PVC Cable.
how to check three phase motor torque value?
The synchronous machine excitation system explain
We need to current density & short circuit calculation at 65kA for aluminium & copper busbar.
What is creepage distance..... what will be the value for different voltage level
what is the working principle of a DG Set, Alternator, & exiter
how much excitation voltage required to generate 1mw power?