why the generator will take 8 to 12 hours to start after it
got interrupted due to technical problems in case of power
plants.

Answer Posted / venkatesan.j

In a thermal power plant the prime mover is a steam
turbine. In order to obtain the rated speed in a turbine it
takes about 4 to 6 ours depending upon the type and
capacity of the turbine.

Is This Answer Correct ?    3 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the significant parts of dc generator?

632


Explain the laying procedure and laying depth of submarine/subsea power cable for 220/400KV system? Also available cable diameter?

1687


How does an induction motor start?

736


What are the basic & Majour problems in UPS ?

1597


Is there any Electrical supervisor license which gives permit to work whole India rather than individual state??

1388






What does the kvar means?

658


i have flexible wire. size of conductors is 0.190 mm & no.of conductors are 48. then size of wire comes 1.37 sqmm instead of 1.5 sqmm . the what is tolerance for this size.

1321


How many energy meters can be connected on a 15VA Voltage transformer. please send a calculation sheet.

1508


what is thermal resistance of PVC Cable.

1347


how to check three phase motor torque value?

1739


The synchronous machine excitation system explain

1325


We need to current density & short circuit calculation at 65kA for aluminium & copper busbar.

1245


What is creepage distance..... what will be the value for different voltage level

1501


what is the working principle of a DG Set, Alternator, & exiter

9745


how much excitation voltage required to generate 1mw power?

1599