What is the Frequency while we step up the voltage from
220V to 11KV? Is it possible? Explain it?
Answer Posted / fransis
Generally Frequency is maintained by generation station for
a common distribution system.It is not possible to change
frequency while step up or step down the voltage on any
transformer.
This is also possible to change the frequency by term of
electronic controll device like in soft starter. In the soft
starter frequency is controlled with voltage to control the
speed of motor.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
what is the series parallel connection of capacitors? and how can we use these application in three phase motors for controlling torque?
WHAT IS DIFFERENCE BETWEEN MANUAL CONTROL AND MAGNETIC CONTROL AND STATE ITS ADVANTAGE /DISADVANTAGE
why do we lay up the core of a cable?
In a Impedance Based Distance Relay (Quad Characteristics) - Could there be two different Line Angle(RCA) for Ph-Ph & Ph-Gnd? If So Kindly Let me Know.. Where, What are the advantages of the same?
Is there any problem about which the drive (inverter) doesn't show/display the alarm and/or fault but instead of this , it doesn't work ? I want to know that could there be any kind of problem in the drive when the drive doesn't display the alarm and/or fault ?
In diesel generator how AVR get voltage to excitation. And basic diagram DG EXCITATION CIRCUIT.
How to test the Secure Elite 440 Multi function meter working condition.
What is the bundle conductor?
what is the most permissible winding temp when we conducting a generator load test?(condition no load)
IF DISTANCE IS 100METERS B/W AMP.METER AND CURRENT TRANSFORMER WHAT WILL BE AFFECT IN ACCURACY .METER CAN SHOWING ACCURATE CURRENT OR NOT IF NOT WHAT CAN I DO TO GET 100% ACCURACY.
Explain and give examples about VCB?
What is electrical grounding?
to vary valtage from 0 - max a variac is necessary . so how to design for high power applications nearly about 200KW power
What are the Return ( Monthly / quarterly/ Annual submitted to Electical Inspector for an establishment (Factory in Maharashtra-- Small scale category having seperate HT line of 22KV ) as per Maharashtra Electricity Act
What is the operating principle of turbo-generator.