On what basis no of earth pits are to be decided either for
transformers or for equipment?

Answer Posted / mrudang

earth pit is depnd upon

on vector group of transformer which we are used
equipment body earthing ,in delta connection we required
earthing transformer to protect from earthfault current

Is This Answer Correct ?    1 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

CAN CU XLPE/PVC CABLE BE USED INPLACE OF LOW NOISE SCREENED CABLE? KINDLY GIVE REASONS

1404


Can we put 3 layers of cable tray while installing tray

1933


What are the basic components of the feedback control system?

609


Explain the working of any one cutting machine

655


how solar power plant energy meter multiplication factor

1582






How relay coordination has to be done? what are the inputs are required for this? Please explain this with calculation method?

1342


This is reqd for a 1MW Solar power plant..We have 2DC outputs from the solar panels Connected to 2INVERTOR panels.. Output from invertor is 3ph,280v,500kva,50hz.These are connected to individual ACB.This has to be stepped up to 11KV ,1250KVA SYSTEM.Now can I use (1) one more ACBTO GIVE A COMBINED OUTPUT OF 1000KVA,280V & STEP UP THE OUTPUT BY USING a single two winding 3 ph transformer 11kv/1250kva. or (2)use the two outputs and connect to one three winding transformer of above rating..Pls suggestwith details.

1995


what will happen if there is a voltage leakage or current leakage in an electrical train

1497


I am applying for NTPC examination.Can we please provide previous paper to my mail prasad.chintala108340@gmail.com

1726


if main CT is of ratio 50/5, and meter CT is -/5 what will be overall multiplying factor of meter.PT is 11000/110 .

1152


What does the term power factor shows?

592


What is the distance between each insulator in 33kv transformer and how can it calculate

1747


Operation carried out in thermal power stations?

588


How LT megger works ?

1677


in basic 2 phase will short means tripping the power but spot welding 2 phase shorting but not tripping it will welded why.....(Q)

1493