minutes hand gains 45% at 11.20 p.m. so finally what is %
of time gained by minutes hand

Answer Posted / archana

min hand travels 360 deg in 60 min
=>6 deg in 1 min
=>speed = 6 deg/min
45%of 6 deg /min=2.7
6 deg = 1 min
2.7 deg = 27 sec

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the sum of 7 consecutive odd numbers with 27 as the fourth number

776


33 1/3 of 101 + 296 is

910


A company installed 36 punching machines at the begining of the year.In the spring they installed 9 additional m/c's and then discontinued 18 in the fall.How many were still installed at the end of the year?

830


A class consists of 100 students, 25 of them are girls and 75 boys; 20 of them are rich and remaining poor; 40 of them are fair complexioned. The probability of selecting a fair complexioned rich girl is

775


if a,b>0 and a+b=2 then the max value of ab is

757






The house is big and lovely but since nobody uses it it is pretty much a white Elephant What does White Elephant mean?

845


A cubical rectangular bar has the dimensions with the ratio 5 : 4 : 3. Its volume is 7500. What is the surface area of the bar?

1265


Two ladies ,two men sit in north east west south position of rectangular table. Using clues identify their position ?

752


A can do a piece of work in 30 days, which B can do in 20 days. Both started the work but A left 5 days before the completion of the work. It took how many days to complete the work?

718


If x,y,z are chosen frm -3,1/2,2 what is the largest value of (x/y)*z*z

714


Find the nth number in the series is 1, -3, 5, -7.___

754


A sum of money becomes 2.5 times itself at 12.5% simple interest p.a. What should be the period of investment to get this much return?

799


A and b can do a piece of work in 15 and 10 days. A and b work on it for sometime and then a leaves b completes the job in 5 days. For how long did a work.

787


A can work three times as B can work. If A takes 60 days less than B to complete the same task, calculate the number of days when both A and B start working together on the same day.

653


What percent of 60 is 12?

795