you are a civil engineering student so what you have done to
improve your knowdge
Answer Posted / praveen gupta
Obviously if u r a civil engineering student no one wants
to know ur IT Knowledge.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
what are the challenges of being a team leader and a supervisor?
Technical Question of Civil Engineering
why demand factor less then 1 ?
what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??
How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy
For what purpose bedding is used under storm water drains?
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?
all technical question
can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
can you give me the details of rate analysis of steel and concrete?
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
what is Short bored pile foundation.
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6