Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to Calibrate Penumatic Transmitter.LRV= -60 URV= -20.Can
u give me Answer.

Answer Posted / suvendu sekhar giri

You can give positive pressure on low pr side keeping the
high side open to atomosphere for lrv (-60) & urv (-20)or
you can give negative pressure on high pr side for lrv(-60)
& urv(-20) keeping low side open to atomosphere.You can
adjust zero at lrv & span at urv. If it is smart
transmitter then you can zero trimming keeping both the low
& high pressure side open to atmosphere.

Is This Answer Correct ?    2 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Derive capacitance to 4-20ma conversion formula / relation in capacitance type pressure sensor?

2219


2. What is ultrasonic flowmeter?

5053


dear sir we have insatlled positioner model no.sipart PS2 make Siemens at our control valves . now problem is if we want to increase the response of valve opening speedy /fast. what parameters do we change for positioner ? any idea. please guide us.

1869


WHAT ARE THE INSTRUMENTAL DIAGRAMSOF VALVES?

2112


how u calibrate pneumatic n motorized c/v?

1952


How to calculate P,I&D value in PID controller ?

2120


hi i am eswar i want to know the instrumentation interview questations for eil(engineers india ltd) i have applied for engineer post in eil please help in this.my mail id eswar310@gmail.com

2540


what is piezoelectric transducer?give an example in power plant n state its principle?

2571


Valve positioner and actuators in detail.

1771


Emergency Shutdown Systems/ Plant Shutdown System.

2243


KAlman filter code for two dimension?

2050


How is automatic reference junction compensation carried out in temperature recorders?

1074


What is feed factor and its Importance in cement industry? How we can solve feed factor?.

3584


in natural gas indirect water bath heater,how to prevent the problem of backfire from firetube during ignition...becoz of this backfire performance of wbh is going low.

2790


the output of the common trasmitter protocol in qatar gas are the following

1999