Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is different between installation and commonissonig.

Answer Posted / saravanakumar

INSTALATION MEANS ERECT THE MACHINERY AS PER THE GIVEN
DRAWING WITH SAFTY AND WITHOUT ANY DAMAGE OF THE MACHINERY.

COMMISSIONING MEANS THE SAME MACHINERY IS HANDOVER TO THE
CUSTOMER WITH GOOD WORKING CONDITION

Is This Answer Correct ?    10 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain what is rated speed?

1076


Single line diagram for dbb (double bus bar)system.

1883


Can i use the B-curve MCB instead of C-curve MCB

1966


What Should be the value of Vector Surge angle at Tripping and how to calculate it?

2009


what is the necessity of under ground cables ??

2029


How to measure current and voltage in an ELV circuit

4085


What is nyquist contour?

1139


what is harmonics? what are the factors it will depend upon

1974


If a current -8+6sin6t is flowing three ammeter, one is a centre zero PMMC meter, one is true rms meter and one is moving iron meter. What are the reading of these three meter respectively?

2164


IF TVM OF TRANSFORMER SHOWS POWER FACTOR ON 33 KV SIDE AS 0.97 LAGGING AND ON 132 KV SIDE IS 0.75 LEADING.IS THIS CORRECT.WHERE IS PROBLEM.

2294


how we control automatic generator i'e with to supply (main supply and local generator) when the main supply was break to supply the local supply automatically to begin supplying power.I now this control circuit is the combination of contactor time delay contactor switch and overload relay .but my question is how we combine those component thank you

1947


Define average demand?

1296


how to set the time in digital timer ?

1969


Define noise?

1107


What are the causes for the failures of sandwich type (Al) busducts?

1803