what is periode of deshuttering for different area of slab
Answer Posted / nikunj faldu
yas, santhosh kumar statment is right, but that depend up
on span of slab also, bcos. the dead load of slab is bigest
fector efecting on deshuttering.
than second, almost people remove shuttering below the slab
and beam bottom are stay long time, unother give a support
on bottom and remove shutter, that's all right.
one more sugetion is if that wall shuttering so, u must be
remove after 24 to 36 hours.
| Is This Answer Correct ? | 26 Yes | 4 No |
Post New Answer View All Answers
What is rate of concrete surface rendering work per sqm
what is tension column?
What does civil engineering mean?
what is the effect of duration of earth quake on framed structures ?
Slump Values for works?
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
What is a projection line?
which formula used for calculate the area of segmental arch?
how gradation of aggregates effect on slump of fresh concrete?
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
How many times we can use Fresh bentonite ford wall execution? Would like to know the clear concept of recycling. After flushing can we use it for another time time for flushing? Or we have to use it for for excavation only?
How do you compute the volume of airflow?
What is type failure of road surface? how to repair the failure of road surface?
what is the steel difference between np-2 and np-3 pipes and weight also
What is meaning of tlc