what is periode of deshuttering for different area of slab
Answer Posted / nikunj faldu
yas, santhosh kumar statment is right, but that depend up
on span of slab also, bcos. the dead load of slab is bigest
fector efecting on deshuttering.
than second, almost people remove shuttering below the slab
and beam bottom are stay long time, unother give a support
on bottom and remove shutter, that's all right.
one more sugetion is if that wall shuttering so, u must be
remove after 24 to 36 hours.
Is This Answer Correct ? | 26 Yes | 4 No |
Post New Answer View All Answers
How to take labor charges for construction of 1cum of concrete?
How can i display 5 asterisk and another 5 asterisk )?
HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
What is the Unit weight of coarse sand (F.M- 2.20) ?????
how i can calculate the actual nos & size of steel to make 1000sqft. x 3"thick slab
Define different types of roof systems?
Form where IS456 is adopted in 1978?
I what know about life time of frp tank plz explain about it specifications & other details
What is the biggest dam in america?
what is polity
in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing
can i get hindi version of is codes based on civil engineering?
what is flexible and rigid footing?
Define polar co ordinates.