Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

WHY THE WIDITH OF COLUMN IS TAKEN FOR DESIGN OF ISOLATED
FOOTING??

Answer Posted / d v n potharaju, hyderabad

Firstly size of the column is required for calculating the
max bending moment occuring at the face of the column i.e
for calculating the depth based on B M cretiera.
Secondly size of the column is required for calculating
the max punching shear force that has to resist i.e for
calculating the depth based on punching shear cretiera.
Out of the above II cases max depth has to considered.

Is This Answer Correct ?    2 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the applications of cad?

1236


cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate

1622


what energized you to complete your course?

2418


how statics is different from dynamics

1653


How to calculate density of 40 mm coarse aggregate, in mixing ration 1:1.5:3? Please explain calculation for density

2023


please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)

1723


can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com

2496


how to find ssm in foundation?

1920


1:4:8 pcc calculation 591 cu.ft

2283


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

2442


What is demising walls?

1151


On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??

3277


how to calculate load bearing column

3570


how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )

2720


What is the diff between cad & cadd?

1163