What power factor maintain you maintain at u r organisation
Answer Posted / william lobo.
We maintain 0.8 and above since we are penalised by KEB for
low pf. we generally maintain close to 0.9 by use of power
capacitors. Too high i.e. above .95 is too costly to
install and also the problem is that if power factor is
close to 1 then there are chances of high voltage affects
motors and we suffer more motor burning at our plant.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is the classification of hydro projects based on installed capacity?
why we use two slope(differential & restraining) in differential relay.but in busbar protection differential we are using only one slope?please explain
How does "OUT OF STEP" relay ,for Synchronous motor protection, work?
How to configure the drives in PLC, through Profibus commnication. And to how to address it?
Dear all, how we select the cable size according to current with or without including different correction factor , is there any direct method for sizing of cable...
how we calculate the withstansing current capacity of wires&cables?
why we use four type of phase angle difference between pimary & secondry winding of a transformer & where we use them?
What does the term supermesh means?
Sir, I m 3rd year student 4m DCE and want to do internship in siemens or l&t or any other mnc related to electrical engineering. please tell me the procedure 4 same and oblige me
if any house we instaled a 1.5 ton ac and its phase cable of wiring is installed but netrual cable of wiring not instaed. my question is that is neutual of house(for other wiring is capable for ac load or a sepeart neutrual wiring required
Load break swicth maintenance procedure.
63MVA,220KV/6.9KV Transformer LV side neutral is connected to Earth pit through NGR. Whether this earth pit required to connect with near by below grouding earth mat or it is to be kept separate?
I want definition for ABT Meter (Availability Based tariff) ?
What is critical disruptive voltage?
What is time response of the control system?