i want to change some data like price, data etc in created
purchase order. but system is not allowing the same. as a
support SAP MM functional consultant what you would do?
Answer Posted / salim malik
FIRST YOU NEED TO UNRELEASE THE PO THEN ONLY SYSTEM WILL
ALLOW YOU TO CHANGE THE DATA IN ME22N
Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
Differentiate between release procedure with and without classification
How do you display parked documents?
How do we create a client in the mm module?
Define the consignment cycle?
If there is a pipe and you send it to a sub-contractor to be cut in to two or three pieces. How will you map such scenario in sap? Will you create separate material codes for each pipe with different length or what will be your approach?
What is the procedure to make the source list automatically appear in material master as default if maintained at plant level using ome5?
What do the we101 do?
What do you mean by a reservation?
What is a cost center?
What settings required to create purchase order automatically from a pr?
What are the plant-specific data in the material?
How to create movement type?
What is the organizational structure in the materials management (mm) module?
Explain how you can change the standard price in the master material?
what is access number in access sequence how do we define that ?