i want to change some data like price, data etc in created
purchase order. but system is not allowing the same. as a
support SAP MM functional consultant what you would do?

Answer Posted / salim malik

FIRST YOU NEED TO UNRELEASE THE PO THEN ONLY SYSTEM WILL
ALLOW YOU TO CHANGE THE DATA IN ME22N

Is This Answer Correct ?    4 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Differentiate between release procedure with and without classification

662


How do you display parked documents?

692


How do we create a client in the mm module?

691


Define the consignment cycle?

696


If there is a pipe and you send it to a sub-contractor to be cut in to two or three pieces. How will you map such scenario in sap? Will you create separate material codes for each pipe with different length or what will be your approach?

827






What is the procedure to make the source list automatically appear in material master as default if maintained at plant level using ome5?

619


What do the we101 do?

662


What do you mean by a reservation?

670


What is a cost center?

802


What settings required to create purchase order automatically from a pr?

673


What are the plant-specific data in the material?

635


How to create movement type?

694


What is the organizational structure in the materials management (mm) module?

646


Explain how you can change the standard price in the master material?

625


what is access number in access sequence how do we define that ?

544