specify three views for which formulas can be entered.(work
center)
Answer Posted / pravin mandgaonkar
In follwing three views of Workcenter ,formula can entered.
1.Capacity
2.Scheduling
3.Costing
Is This Answer Correct ? | 12 Yes | 0 No |
Post New Answer View All Answers
Explain the mrp group and their uses.
Standard mrp steps
What is the SPRO Path for requirement class and req. type?
What are the customer activities followed for pp module ?
Difference between base unit of measure, production unit, order unit
How is indian slab and us slab?
Hi All, In Repititive manufacturing during backflush we enter the production date and the batch. The classification for production date and Shelf life expiration date has been maintained in the material master. We have a characteristic "date of last goods reciept"which updates the characteristic value in the batch classification automatically from the production date entered in MFBF Tcode. Even though we have maintained the min shelf life and total shelf life the system does not calculate the remaining shelf life for the batch and does not update the value for shelf life in batch classification. Please suggest the procedure for updating values in batch classification for shelf life automatically from MFBF Regards, LN
What are some important tables used in pp (production planning)?
What is internal payroll process?
• How are basic order dates determined?
What is a ‘bom’?
What is primary cost and secondary cost?
Mention what are the t-codes for creating, changing and summarizing bom?
What is the difference between pp and pp-pi? Which one is better and how ?
Checkdigit example