Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What structure do your BOMs have? How many levels are there?
How many components are there on each level?

Answer Posted / jinchandra mule

BOM IS A multilevel,
we can assign bom level by level cs11,
level 1 bom header material assembly level,
contains components which also have bom contains
level 2 bom sub assembly level
last lower level is
level 3 components level .

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Hi All, In Repititive manufacturing during backflush we enter the production date and the batch. The classification for production date and Shelf life expiration date has been maintained in the material master. We have a characteristic "date of last goods reciept"which updates the characteristic value in the batch classification automatically from the production date entered in MFBF Tcode. Even though we have maintained the min shelf life and total shelf life the system does not calculate the remaining shelf life for the batch and does not update the value for shelf life in batch classification. Please suggest the procedure for updating values in batch classification for shelf life automatically from MFBF Regards, LN

4833


what are Standard keys

2141


Explain the gaps and the steps involved in them.

1083


Which BOM item category you have used?

1563


Can we use the same routine for materials undergoing the same process/operations? Can we avoid separate routing for each and every material produced?

1137


Explain customer Independent requirement .

2241


Explain about rough cut planning

1865


How do I default it 41?

1061


Explain the mrp group and their uses.

1058


Explain the mrp controller and their uses.

1358


What is Schedule Margin key. How floats works in scheduling?

3189


Explain PI sheet.

2032


Where have we to specify the teardown time in one operation?

1080


Why and how you calculate WIP?

1775


Difference between PP and PI.

2218