why main steel is to be reinforced in shorter direction in
case of slab?
Answer Posted / sjtbehera
in a slabs the shorter sapn is to be consider design.so the
main bar is kept lower and longer direction are bar is to
kept bind to main reinforcement.
Main bars are designed to load the bending moment, super
imposed laod and stress develop. the distribution bar are
distribute of stress caused by the super imposed laod,
tempreature variation and shirnkage.
| Is This Answer Correct ? | 84 Yes | 23 No |
Post New Answer View All Answers
what is the type of earthing
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
What is a hatch patterns?
how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high
What is the standard volume of pharma in cub ft
Why does the pressure increase under soil?
at what pressure ply-wood is obtained by gluing wooden sheets
What is zoning permit?
find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.
do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?
What is the minimum size of the particles of silt soil?
How many square meter can mason layout chb per hour
Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com
What is the strength of cement?
howto calculate the quantities of material used in fly ash brick after finding the volume??