Answer Posted / ashish
The V-model is a graphical representation of the systems
development lifecycle. It summarizes the main steps to be
taken in conjunction with the corresponding deliverables
within computerized system validation framework.
The VEE is a process that represents the sequence of steps
in a project life cycle development. It describes the
activities and results that have to be produced during
product development. The left side of the VEE represents
the decomposition of requirements, and creation of system
specifications. The right side of the V represents
integration of parts and their verification
A concept of operations that describes user needs and the
operating environment, thorough and testable system
requirements, detailed design, implementation, rigorous
acceptance testing of the implemented system to ensure it
meets the stated requirements (system verification),
measuring its effectiveness in addressing goals (system
validation), on-going operation and maintenance, system
upgrades over time, and eventual retirement
| Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
What is difference between cmmi and cmm levels?
Can any one share the domain knwoldege of Telecom Jeeva jeevachr@gmail.com
What is mean by Schedule report who is the responsible for generated that one ?
How to Generate Test Case for Shopping Cart?
How would you do the ollowing Security Testing for web application? 1) Authentication. 2) Authorization. 3) cookies. 4) penetration testing. 5) session testing. 6) encryption and decryption testing pls give examples give example i can't understand so pl
What r the functional testing u perform?
Explain the sub-genres of performance testing?
Is Anyone attended the manual testing interview with capgemini in recent past. please let me know the type of questions they can ask. Thanks
What do you mean by Cause Effect Graphing? in which standard its mentioned?
What is your approach when requirements change continuously?
What is difference in between operating system 2000 and os xp?
write the test senario on opening door in the flow diagram format
Hi, this is murthysharma. I need very urgently about some terms which are used in use cases? Plz give reply to me, if any body know, It is really very very urgent. 1. what is the difference between basic flow,exception flow and alternative flow? 2.what are non-functional requirements in use cases? 3.what are exceptions, special requirements, business rules, assumptions, constraints. Kindly give me with the example. Bcoz, I am very new to this use cases. thanks in Advance. Regards, M.MurthySharma
hi every one can you send me ISTQB Course material on my Email id deeptimundra997@gmail.com
Please can any one tell me 1).Types of reports 2).Types of Meetings.