TO operate transformers in parallel, vector symbol of the
both should be same.If one transformer name plate is not
there, how can we conclude that whether the transformer is
having the same vector symbol or not?
Answer Posted / mgalalkhedr
This vector group test is done at site to check if their is
any damage in the windings during transportation and
erection.
3 -phase AC supply is given on HV side. R-Phase HV and r-
phase LV shorted.
Then to qualify the test following conditions are to be
satisfied after measurement of voltages.
nR+nY=RY, By>> Bb and Yb=Yy.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
We have a couple of oil tanks at our plant. One of them does not have a lightning arrester installed. My question is it necessary to install an arrestor on every tank or will this particular one be covered by the arrestor installed on the ajdacent tank, Since all the tanks are close to each other. Basically, I want to know that if these arrestors or protection works in a parituclar area of effect or influence. Thanks
what is a composite error in current transformers, why occurs & in which it will occur i.e, either metering ct/ protection ct
how net resistance islow in star connection and viseversa in delta connection...? if anybody could explain in detail it wud be helpful.
How cable from Kit-Kat to main switch, from starter to motor are designed?
what questions will be asked for 11/33KV licence interview APSEB hyderabad. Can any one share question and answers.
which book to refer in electrical engineering for iocl exam & which book for general english.
In india, according to trade theory above 5 HP motor reqired star delta starter. But we R connect 11 KV motor with 14MW in Direct to line ( With VCB starter combination) Can U Guess, How it is possible ?????
We have Diesel generator of 200KW. fuel consumption is always same,even connected light load or full load. Is it right?
What is the most essential condition for the voltage build up for a d.c. Shunt generator?
in Telecom DC system-why positive +ve is made earthed.and - ve is fed to load.
Is neutral transformer can be called as control transformer?
how is control wiring coding is done in a CRP panel ?
I HAVE A 50A MCCB AS PER DESIGN LINE WIRE CONNECT UPWORD SIDE AND LOAD IS CONNECTED TO DOWNWARD SIDE TO THE MCCB.IF NOW ANY ONE CHANGE SUPPLY & LOAD(WISEVERSA) WHAT HAPPENS ? DOES MCCB OPERATION OR WORKING FUNCTION NORMAL IF YES THAN WHY THERE ARE MARKED LINE & LOAD ON MCCB.
can i use ups power as a raw power for another ups
How to test Alternator stability test for REF relay