I'm puting roof slab M20 Design Concrete,Twoway slab how
many days wait for remooving of shuttering?
Answer Posted / veeramani amanthan
hi friends thank you your reply to me but now confushing
wich one i take 14 days or 28days please conform
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?
Different sizes of Hollow blocks and its weight. Thanks.
Explain what is 1/8 on the architect ruler denotes?
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.
Process of pcc in wateredug
In Residential home construct footing,beam, column,lintel,rcc roofs which dia rod used how to self assumed
what is concrete canvas?
what is the percentage of silt in black cotton soil.?
How much cement and sand required for 9"brick wall per square metre
Bernaullis theorem deals with the law of conservation of mass momentum energy none
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
explain fie benefits of using standard terminology in the measurement process