I'm puting roof slab M20 Design Concrete,Twoway slab how
many days wait for remooving of shuttering?
Answer Posted / tanvir , faridabad
it should be removed in 28 days in winters , in summer it
can be open in 22 days
| Is This Answer Correct ? | 5 Yes | 4 No |
Post New Answer View All Answers
What is limit state method and working stress method and ultimate method
how to find quantity of concrete in PCC M15
Name the main components of a cad gui?
how to calculate the chair reinforcement length in slabs, footing or anywhere??
What are the basic use of runners and standards of pipelines?
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57
Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct
explain fie benefits of using standard terminology in the measurement process
what r you reqired for concrete baching plant?
What is Refuse Area In High Rise Building ?
whaat is blister in box girder bridge and what is its function..
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?