what is SHEAR WALL ? why and where it is provided.
Answer Posted / xxx
how shear wall constructed??
using form work
Is This Answer Correct ? | 10 Yes | 18 No |
Post New Answer View All Answers
Which are the Steel tests ?
what is differences between ferrock and concrete ?
I have an span length 16 ft c/c
WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
What do you mean by bond? What are the different types of bonds?
Difference between lime, distemper and plastic emulsion?
How to do base isolation using ETABS software?
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
Formula for calculation volume of essentric footing
why +1 to be followed for calculating the no of bars in BBS. Please explain
What is the diameter of the 3"inch nails?
What is rate of concrete surface rendering work per sqm
what is the types of surveying?which type of survey carrying for type of work?