I'm puting roof slab M20 Design Concrete,Twoway slab how
many days wait for remooving of shuttering?
Answer Posted / vinod
as per curing period will b 7days r 28 days the same can be
used for de shuttering
Is This Answer Correct ? | 4 Yes | 4 No |
Post New Answer View All Answers
Why are pull-out tests performed for soil nails?
What is an object snap mode?
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
Define What is unit weight of normal concrete?
what is right & short method of measurement of slab&beam
why we use for testing of compression strength concrete the size of specimen 150x150x150. why we are not using another dimension like 100x150x100 uneven dimension.
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
What is unit weight of normal concrete?
How high should the water tank be to provide a 60 psi at base of this water tower?
How to estabilish reinforcement Steel rolling margin for a building projects ?
how can we calculate steel value, depending on load
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
how many cement used in single story residential building per sqft
How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure
what pressure the NP2 class RCC pipe can sustain?