I'm puting roof slab M20 Design Concrete,Twoway slab how
many days wait for remooving of shuttering?

Answer Posted / vinod

as per curing period will b 7days r 28 days the same can be
used for de shuttering

Is This Answer Correct ?    4 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Why are pull-out tests performed for soil nails?

756


What is an object snap mode?

734


how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6

1022


Define What is unit weight of normal concrete?

679


what is right & short method of measurement of slab&beam

1586






why we use for testing of compression strength concrete the size of specimen 150x150x150. why we are not using another dimension like 100x150x100 uneven dimension.

1471


Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?

1652


What is unit weight of normal concrete?

680


How high should the water tank be to provide a 60 psi at base of this water tower?

680


How to estabilish reinforcement Steel rolling margin for a building projects ?

3651


how can we calculate steel value, depending on load

1700


why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?

10224


how many cement used in single story residential building per sqft

1295


How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure

1773


what pressure the NP2 class RCC pipe can sustain?

2214