I'm puting roof slab M20 Design Concrete,Twoway slab how
many days wait for remooving of shuttering?
Answer Posted / nagori salim
Completely depends upon Grade of Concrete
Higher the Grade, Lesser will be the period for deshuttering
Is This Answer Correct ? | 7 Yes | 6 No |
Post New Answer View All Answers
In Residential home construct footing,beam, column,lintel,rcc roofs which dia rod used how to self assumed
Define What is unit weight of normal concrete?
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
what is the 0 value in quantity surveying
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
What is the formula for figuring out how many gallons of water are in a pipe by the foot?
Define What are the reasons for geotechnical site investigations in Uganda?
how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?
what is meant by csr in foundation? what is sbc?what is meant by contour line?
what does the grad of cement shows (denotes)?
how to disign cuplock shuttering and it's matireal requirement snd any related web site
What are the uses of layer?
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
How is make concrete cube?