I'm puting roof slab M20 Design Concrete,Twoway slab how
many days wait for remooving of shuttering?

Answer Posted / nagori salim

Completely depends upon Grade of Concrete

Higher the Grade, Lesser will be the period for deshuttering

Is This Answer Correct ?    7 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

In Residential home construct footing,beam, column,lintel,rcc roofs which dia rod used how to self assumed

2698


Define What is unit weight of normal concrete?

671


WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)

3251


what is the 0 value in quantity surveying

1923


Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever

1775






What is the formula for figuring out how many gallons of water are in a pipe by the foot?

647


Define What are the reasons for geotechnical site investigations in Uganda?

682


how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?

2137


what is meant by csr in foundation? what is sbc?what is meant by contour line?

1823


what does the grad of cement shows (denotes)?

1143


how to disign cuplock shuttering and it's matireal requirement snd any related web site

2508


What are the uses of layer?

729


How to calculate sand , cement quantity for 23mm thk brick work(10x10)

4722


Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.

1911


How is make concrete cube?

695