I'm puting roof slab M20 Design Concrete,Twoway slab how
many days wait for remooving of shuttering?
Answer Posted / nagori salim
Completely depends upon Grade of Concrete
Higher the Grade, Lesser will be the period for deshuttering
| Is This Answer Correct ? | 7 Yes | 6 No |
Post New Answer View All Answers
03. a. The water cement ratio for achieving maximum strength of concrete is…… 1 b. Water/ cement is inversely proportional to-------------- 1 c. Increasing the slump decreases the strength: True / false 1
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
how many minimum admixtures are used in water froofing structures
Is it possible to make a feature using an overdefined sketch?
what is the construction cost for per cft of multistorryed building in kolkata?
how to caluclate sienerge qty in construction in ap
what radial pressure, the NP2 class rcc pipe can sustain?
how much of the strength comes from post-production curing
What is construction mitigation management?
What is meant by a context menu in a cad software?
What are the different types of runners?
how to find quantity of concrete in PCC M15
What are the basic use of runners and standards of pipelines?
rate analysis hiring of generator 62.5 KVA
How foundation is designed, Column design and beam design