Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What are the different pre-commissioning tests that are
performed on the distribution transformer, power cable and
switchgear (11kv)?

Answer Posted / pillay

Most importantly the insulation and HV holding test is done on
all the installations.
on the tx former;winding insulation test,
ratio test, vector group test,impedence test, oil dielectric and
other test,
bucholtz relay test, all protective equipments operation test,the
switchgears insulation and conductivity tests along with pressure
tests on cables also . all tests have to meet the local
requirements or as relevant BS.

Is This Answer Correct ?    15 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is EHT tariff or Power factor Tariff ????

2348


defination of controlled shunt reactor

2251


what about electrical pannel.? What is meant by plc pannel.?

2295


What is the difference between a Root Locus plot and a Bode plot?

1288


what types of cable used in underground coal mining?

1486


can anyone send me some sample question regarding power grid corp

2209


What is the types of HT motor testing

3592


explain the types of drives

1980


how to check three phase motor torque value?

2384


why constant voltage transformer should be start without load? and if started then what will happen?

2049


After taking shutdown of 11kv feeder, if you see 5kv by phasing stick in the cable side, is it possible to close earth switch in cable.

2357


In constant power region of 3-phase IM torque-speed characteristics, if frequency increases slip A does not alter B decreases C increases D none of above

2059


why can the rotor of 3 phase slip ring induction motor not be a 2 phase rotor?

2069


sir, i am 3 years diploma course pass out candidate.what type of certificate can i got in marine service.

1934


HI SIR, AM PREPARING FOR RRB FOR SECTION ENGINEER POST. PLZ SEND ME THE PREVIOUS QUESTION PAPERS AND HELP ME. I HAVE NO ENOUGH TIME MY EXAM DATE IS 22ND JUNE.... MY EMAIL ID IS nalla.amarnath@gmail.com

1947