Answer Posted / rovel delalamon
loopcheking, field to the control room.from instruments to ijb.formijb to mrashalling cabiet.,,check polarities,check the voltage suplly w/24v dc. chech also the possible leaks of the tube.and warm-up 5mins.prior to calibration.use HART COMMUNICATOR.highway addressable remote transducer.the one who configuer the input and output of the trnsmitter
| Is This Answer Correct ? | 42 Yes | 17 No |
Post New Answer View All Answers
what is difference between HOT permit and cold permit
What are primary elements of measuring pressure? Which type of pressure can be measured by these elements?
describe flow nozzel principle?
we are having yokogawa centum cs3000 dcs in our power plant. i need some of the operator guides NOT to appear in HIS0163 AND HIS 0162 but it shoul appear in HIS0164 HOW TO DO IT?
hi friends,im an instrumentation and contol engg student,can u hlp me of suggsting barc written question paper,my id is roysuvaranjan@gmail.com, cel no.9563591747
Specify for Cables - Flame Retardant and Fire Resistant?
Please send me the sample question of Instrumentation of hpcl/iocl exam. my mail id hihi_kiholo@rediffmail.com
Make a ladder diagram on LSL valve will close, on PSL valve will open and start the motor
If we increase only P what will be controller action ?
principle of dead weight tester ?
please send data bank of quetions answers on analytical instrumentation.
how do u calibrate the vacuum transmitter if it shows more reading
Which type of pressure can be measured by these elements?
How to Calibrate Ultrasonic Level Transmitter in field
i have steam drum height 1000mm. and i want to placed the transmitter below the tap.how i calculate.