I'm puting roof slab M20 Design Concrete,Twoway slab how
many days wait for remooving of shuttering?

Answer Posted / leo

remove the shuttering of beam shall be after 28 days

Is This Answer Correct ?    4 Yes 9 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are segregation and bleeding?

695


For the construction project what capital cost has to be taken in consideration?

677


what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?

1780


what are the types of design? which type of method is used at what type of design & why?

1795


how can we calculate steel value, depending on load

1698






what do you mean by yeild stress of a material? What will happen when hit is given to cement?

1910


how much of the strength comes from post-production curing

1868


How do you change a dimension value in solidsworks?

781


is basic cost of the material includes tax?

1533


What expenses counted in contingencies and how much it is in related to built-up area of the building.

1312


How do you maintain water pressure?

658


What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.

1856


how gradation of aggregates effect on slump of fresh concrete?

1831


which has high compressive strength between hollow block and brick masonry?

1861


How much cement and water required for cement selery????

1425