I'm puting roof slab M20 Design Concrete,Twoway slab how
many days wait for remooving of shuttering?

Answer Posted / k chiranjeevulu

to remove shuttering after 14 days

Is This Answer Correct ?    32 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is type failure of road surface? how to repair the failure of road surface?

1975


How does siphoning work?

820


i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr

1544


How many lbs are there in a yard?

672


How much quantity of rod binding work by a rod binder per day

852






HOw much % of premium on DSR-2013 currently

1532


how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.

10580


plumbing CPVC fitting FTE Brass full form

2128


hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com

1808


Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in

2067


Formula of mid span bar

1461


how to find out hard strata in bored pile when the DMC method adopted.

5310


why does the most of civil engg is not intersted to going for teaching field?

1607


IS code for grade of concrete for bamboo lintel????

1682


Pls explain me about tension and compression in a flat slab

1587