I'm puting roof slab M20 Design Concrete,Twoway slab how
many days wait for remooving of shuttering?
Answer Posted / k chiranjeevulu
to remove shuttering after 14 days
Is This Answer Correct ? | 32 Yes | 6 No |
Post New Answer View All Answers
What is type failure of road surface? how to repair the failure of road surface?
How does siphoning work?
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr
How many lbs are there in a yard?
How much quantity of rod binding work by a rod binder per day
HOw much % of premium on DSR-2013 currently
how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.
plumbing CPVC fitting FTE Brass full form
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in
Formula of mid span bar
how to find out hard strata in bored pile when the DMC method adopted.
why does the most of civil engg is not intersted to going for teaching field?
IS code for grade of concrete for bamboo lintel????
Pls explain me about tension and compression in a flat slab