I'm puting roof slab M20 Design Concrete,Twoway slab how
many days wait for remooving of shuttering?
Answer Posted / k chiranjeevulu
to remove shuttering after 14 days
| Is This Answer Correct ? | 32 Yes | 6 No |
Post New Answer View All Answers
I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.
What is M40 _ TOR - EQ and B.F.S
what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete
What is the minimum size of the particles of silt soil?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
What are the Types Of DPC and its Thickness used?
What is the effect of a building collapse?
What are the different types of runners?
what is the maximum number of course that can be laid according to IS code and the max height.
Define What happens to Load at yielding ?
What is demising walls?
how meny typs of renging rod?
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.
what is the clear cover for shearwall?
any book or article on pumped concrete.