I'm puting roof slab M20 Design Concrete,Twoway slab how
many days wait for remooving of shuttering?
Answer Posted / k chiranjeevulu
to remove shuttering after 14 days
| Is This Answer Correct ? | 32 Yes | 6 No |
Post New Answer View All Answers
How to arrive dry volume of concrete (1.52 to 1.57) ?
Explain major difference between auto level and dumpy level?
Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?
i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh
strength of bitumen concrete with 80-100 & 60-70 grade bitumen
Define graphics window?
what could be the production cost of 1 cum of concrete by CP30 plant
what"s the sort of beams?
How do you change a dimension value in solidsworks?
How to compute minimum number of columns required for a site from area of site?
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
Define absolute co-ordinates?
will fix foundation bolts at site with out template is there any procedure?
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
The 4 main factors to start a construction project are––